What Is a Change Order, and How Do You Avoid Surprise Remodeling Costs?
Straight answers about how professional remodeling actually works — from a Fort Worth general contractor with 500+ projects since 2009.
Request a Free EstimateCall (817) 800-6920- ★★★★★ 4.8-Star Google Reviews
- 500+ Projects Completed
- BBB Accredited
- Fully Insured
- Fixed-Price Contracts
A change order is a separate contract that documents a design, material, scope, or upgrade change to an existing project — what’s changing, what it costs, and your approval, in writing before the work happens. Change orders aren’t a bad thing: they’re the necessary step that keeps contract and financial transparency between owner and contractor.
What a change order contains
A proper change order reads like a miniature contract because it is one: a description of the change (the tile you upgraded, the wall you decided to open, the outlet you added), the price of that change, any schedule impact, and signature lines for both parties. Once signed, it amends the original agreement — so the contract always reflects what’s actually being built and what it actually costs. On a Birdseye project, no changed work begins before its change order is approved.
Why change orders are a good sign, not a bad one
Homeowners sometimes hear “change order” as “cost overrun.” It’s the opposite: the change order is the mechanism that makes sure you are aware of and approve every change and its cost before it happens. The alternative isn’t fewer changes — it’s undocumented ones, discovered as line items on a final invoice you never agreed to. A contractor with a disciplined change-order process is showing you their financial transparency; a contractor who handles changes verbally is showing you how the surprise bill gets made.
How to keep change orders rare
Most changes trace to decisions made too late: material selections after demo, layouts finalized mid-frame. The fix is a real design phase — Birdseye locks plans, mood boards, and every selection before construction, so the fixed price is built on decisions already made. The change orders that remain are the ones you choose (an upgrade you want) or genuine hidden conditions — both handled in writing, both at your approval.
Planning a project? See our home remodeling in Fort Worth page for services, pricing, and recent work.
Frequently Asked Questions
Can I refuse a change order?
Yes — for upgrades and optional changes, it's entirely your call; the project continues per the original contract. Genuine hidden conditions still need resolution, but the pricing goes through the same documented approval.
Do change orders always increase the price?
No — removing scope or choosing a less expensive material produces a deductive change order. The document works in both directions; its job is accuracy, not addition.
What causes the most change orders on remodels?
Late selections and mid-project design changes, followed by hidden conditions in older homes. A completed design phase before demo eliminates most of the first category.
What if my contractor does extra work without a change order?
Don't pay for undocumented work you never approved — and treat it as a process warning. Insist all future changes are written, priced, and signed before work proceeds.
Let’s price your project
A free walkthrough and a fixed-price scope for your exact project — no pressure, no guesswork. Serving Haslet, North Fort Worth, Northlake, Westlake, Justin, Roanoke, Keller, Southlake, Trophy Club, Colleyville, and North Richland Hills.
Request a Free EstimateCall (817) 800-6920